Entry 7 Networking project /connectivity

Today I manged to start the design of the other site starting with South Campus. This is Just a outline design this can be changed at this time this is week 4 of my project. Packet tracer is limited but at this time it seem to run alright with the basics. the network in only in the connectivity stage where with basic configurations it should have local connectivity within each campus first. This includes addressing via Dhcp either ipv4 or ipv6 where required. Then there is configuration of the ether channel links between switches, configuration of
 ip phones vlan configurations and many things along those lines. next stage will be security, connectivity stage should be done by the middle of week  5 at the latest. this is need to meet with milestone one of my project. due in a few weeks.        