Connectivity stage is at beginning with the completion of the design on Central and North.
addressing will be next progress is on schedule, static addressing has be attempted but for end users I have to setup a dhcp for the addressing. designing each building to its specs and the specs of the given network.
This part takes alot time designs should be finished by the end of this week.connectivity is at the base is working statically ether channel ports must be configured to check full connectivity. 

    
 